Next Story
Newszop

Cabinet approves Rs 3,626 cr extension of Pune Metro Line 2

Send Push
The Union Cabinet on Wednesday approved a Rs 3,626 crore extension of Pune Metro Line 2, clearing the way for expanded connectivity in the city.

Phase two includes Vanaz to Chandani Chowk (Corridor 2A) and Ramwadi to Wagholi/Vitthalwadi (Corridor 2B), extension of the Existing Pune Metro Phase–I (Vanaz-Ramwadi).
These two elevated corridors will span 12.75 km and include 13 stations, connecting fast-developing suburbs such as Chandani Chowk, Bavdhan, Kothrud, Kharadi, and Wagholi. The project is scheduled for completion within four years.
imageThe cost of the project will be shared by the centre, government of Maharashtra, and external bilateral/multilateral agencies.

This strategic proposal is a logical extension of the existing Corridor-2 and aligns with the Comprehensive Mobility Plan (CMP), which envisions a continuous Chandani Chowk to Wagholi Metro corridor to strengthen East–West mass transit in Pune.

These extensions will serve key IT hubs, commercial areas, educational institutions, and residential pockets, increasing the share of public transport and ridership across the network, said the government.

The new corridors will also integrate at the District Court Interchange Station with Line-1 (Nigdi–Katraj) and Line-3 (Hinjewadi–District Court) to enable seamless multimodal urban travel.

Under long-term mobility planning, intercity bus services from cities like Mumbai and Bengaluru will be integrated at Chandani Chowk, while those from Ahilya Nagar and Chhatrapati Sambhaji Nagar will connect at Wagholi, allowing passengers to easily access Pune’s Metro system.

After completion of these corridors, the projected incremental daily ridership for the entire Line 2 is estimated at 0.96 lakh in 2027, 2.01 lakh in 2037, 2.87 lakh in 2047, and 3.49 lakh in 2057.

The project will be implemented by Maharashtra Metro Rail Corporation Limited (Maha-Metro), which will execute all civil, electro-mechanical, and related works. Pre-construction activities such as topographical survey and detailed design consultancy have already commenced.
Loving Newspoint? Download the app now